Independent third-party TAB

Accurate Test & Balance. Clear results.

Unbiased air and hydronic testing, adjustment, and balancing for commercial, institutional, and mission-critical facilities—backed by calibrated instruments, practical field coordination, and actionable reporting.

Independent third-party TAB

Calibrated instrumentation

24-hour report turnaround

Nationwide onsite coordination

AABC Commissioning Group logo

Professional membership

Building System Professionals is an ACG member company.

BSP is a member of the AABC Commissioning Group, supporting our commissioning practice and commitment to independent systems verification. ACG membership is separate from AABC TAB agency certification.

Learn about ACG

What we do

Air. Water. Measured and verified.

We establish how the system is actually operating, make the required adjustments, document deficiencies, and deliver results the project team can use.

01

Air systems TAB

Independent testing, adjustment, and balancing of supply, return, exhaust, outside-air, and terminal-unit systems.

02

Hydronic systems TAB

Pump and system verification, flow measurement, balancing, equipment performance checks, and clear final reporting.

03

Commissioning support

Controls verification, functional testing, issue tracking, and system coordination as a complementary secondary service.

Project experience

Current BSP work. Proven individual experience.

Our portfolio is presented in two clearly labeled groups so owners can see both BSP's current project work and the experience its leadership brings from previous firms.

01 BSP project portfolio

Vidor ISD schools

BSP's current contracted project experience is focused on Vidor ISD school facilities. Every image in this group represents work performed through Building System Professionals.

02 Prior professional experience

Experience brought to BSP

These projects were performed by BSP's principal while employed by other companies. They are shown to demonstrate individual technical experience and are not represented as BSP contracts.

Phase 01Review

Confirm design values, scope, access, prerequisites, and reporting requirements.

Phase 02Prepare

Verify systems are complete, controls are stable, and equipment is ready for balancing.

Phase 03Measure & adjust

Test performance, balance distribution, and identify conditions preventing design operation.

Phase 04Report

Deliver clear readings, deficiencies, final results, and actionable documentation.

Interactive project planner

Start with a smarter TAB conversation.

Choose a few basics and get a practical starting scope. It is not a proposal—but it makes the first call more productive.

1 What stage is the project in?
2 What type of facility is it?
3 Which systems are involved?

Field notes

Useful answers—not sales copy.

Publishing specific, experience-based guides like these gives owners a reason to find, trust, and return to your site.

01

Duct leakage

Ask the Expert: What Actually Is Duct Leakage?

What leakage is, why supply- and return-side leaks behave differently, and what a proper duct leakage test actually proves.

Read the field note
02

Building pressure

Solving Building Pressurization Issues: A Case Study

A field-focused look at tracing pressure complaints through measured airflow, exhaust, outside air, return paths, and controls operation.

Read the field note
03

Hydronic systems

What pump and coil data should prove during hydronic TAB

Flow, head, valve position, temperature, pump speed, and equipment data organized into a useful performance picture.

Read the field note

Common questions

Clear answers up front.

What does HVAC testing and balancing include?+

TAB measures system performance, adjusts air and water distribution, verifies equipment operation, documents deficiencies, and records final results against the design values. The exact scope depends on the systems, project specifications, and readiness of the installation and controls.

Is BSP currently an AABC-certified TAB agency?+

No—not yet. BSP provides independent TAB services but is not currently represented as an AABC-certified TAB agency. BSP's ACG membership and commissioning certification are separate credentials, and proposals should state project-specific qualification requirements accurately.

When should the TAB contractor become involved?+

Early coordination helps identify missing balancing devices, access problems, incomplete controls requirements, and unrealistic schedules before they become field delays. Final balancing should begin only after systems are complete, clean, operating, and under stable automatic control.

How is TAB different from commissioning?+

TAB measures and adjusts air and water systems to achieve required performance. Commissioning is a broader owner-focused quality process that verifies systems meet project requirements and operate together as intended. BSP leads with TAB and offers commissioning support as a complementary service.

Can BSP support projects outside Texas?+

Yes. BSP is Texas based and provides nationwide on-site verification and project coordination, subject to schedule and project requirements.

Start a conversation

Need accurate TAB results without the runaround?

Start with your name and work email. Add any project details you already have, and BSP will help identify the right testing scope and next step.

Request a proposal